Service

+86 0512-58587888

Send us e-mail

Call us now

+86 18001565555

Beverage Bottling丨Canning Machine

You are here: Home » Products » Auxiliary » Sleeve Labeling Machine » Double head auto-shrink sleeve labeling machine for pet bottle
Share to:

Double head auto-shrink sleeve labeling machine for pet bottle

The machine is made of stainless steel and high quality of aluminum alloy, the reasonable, intact frame, it is easy to adjust. The feet bolt is not needed, easy to move suitable for different place.

Quantity:
  • TB-250
  • Filltech
  • 8422309090

Product Description

Brief introduction
The machine is made of stainless steel and high quality of aluminum alloy, the reasonable, intact frame, it is easy to adjust. The feet bolt is not needed, easy to move suitable for different place.

1. adopte mature PLC control system technology, make the whole machine stable and high-speed 
2. adopt touch screen control system,make opreation simple, practical and efficient 
3. advanced pneumatic code system technology, make the printed letter clear, fast and stable 
4. wide labeling application, adapt to various sizes of round bottles 
5. roll extrusion bottle, so that the labels attached more solid 
6. production line is optional before or after the machine,also collection turntable is optional for collection,sorting and packaging
sleeve labeling machine.4jpg 1


Parameters
Model TB-150 TB-250
Input power 1.5KW 3.OKW
Out power 220V 220V
Production efficiency 150bottle/min 250bottle/min
size of sleeve labeling machine 1800*850*2000 3000*850*2000
Diameter of bottle body 28mm-125mm 28mm-125mm
Thickness of label 30-250mm 30-250mm
Length of label 0.03-0.13mm 0.03-0.13mm
Inner diameter of paper tube 5''-10'' 5''-10''




 


Turnkey Project

Main product
★ 2,000~36,000BPH carbonated beverage bottling line;
★ 2,000~36,000BPH still purified water/ mineral water bottling line;
★ 2,000~36,000BPH tea/juice bottling line;
★ 2,000~36,000BPH milk/dairy bottling line;
★ 2,000~36,000BPH white/red alcohol drink bottling line;
★ 2,000~18,000cans/H cans beverage production line;
★ 100~2,000barrels/H, 3~5galon production line;
★ Blow moulding machine from 1000~24000BPH;
★ Water treatment system;
★ Beverage preparation system;
★ Turn key projects solutions.



Complete Automatic Groundwater Drink Water Purified Treatment Filter
Complete Automatic Groundwater Drink Water Purified Treatment Filter
Complete Automatic Groundwater Drink Water Purified Treatment Filter
Complete Automatic Groundwater Drink Water Purified Treatment Filter
Complete Automatic Groundwater Drink Water Purified Treatment Filter
Complete Automatic Groundwater Drink Water Purified Treatment Filter
Complete Automatic Groundwater Drink Water Purified Treatment Filter
Complete Automatic Groundwater Drink Water Purified Treatment Filter

Filltech Machine

1. Installation & adjustment
After the equipment are arrived at the customer's site, the customer is responsible for unpacking and arranging the equipment according to the placement
drawing; and does under our install-adjust technicians' guidance. Costs of the staff are decided at last.

2. Training
We are responsible for offering the technical training to user. The training content includes the structure and maintenance of the equipment, control and
operation of the equipment. Through training, users' technical staff can grasp and the skill of operation and maintenance proficiently, and deal with the general
troubles in time. We will appoint qualified technical staff for the guidance.
The buyer can send staff to our company for learning.

3. Quality assurance
We guarantee the goods offered are brand-new, not used, with latest design and suitable material made, and we guarantee the specification of the equipment is consonance with the contract.
We guarantee the line achieve product technical performance indicators within 5 days after feeding operation through the correct guidance of the installation and commissioning.
We are responsible for the fault and damage of the production line caused by our design, technology, manufacture, installation, adjustment and material defect etc. that all belong to our responsibility.
The warranty period is 12 months after acceptance check of the production line. If there is any different between the furnished equipment in the customer's factory and the equipment concerned in the contract, the users have the right to pass the inspection book to the legal department to claim for compensation to our company within goods warranty period.


CE Certification

CE Certification
1). Company has passed ISO9000: 2000 version quality system certification and all manufacture processes are conducted by the standard strictly.
2). All products adopt all-around computer aided design (CAD).
3). From processing to each process of assembly, all spare parts equip with special turn-over box to ensure not falling onto the ground during turning over.
4). Filling valves, capping heads and other main parts are process by digital lathe and processing center. And then they are assembled in special assembly room in order to keep their accuracy and cleanness.
5). All auxiliary parts adopt international and domestic famous brand products.
6). Before delivery time, all complete sets will test run for 3 days continuously. After quality inspection, they can be transferred to the customers.

Water Purified Machine 20tons Per Hour Reverse Osmosis Treatment System

Company Visit

Exhibition Show
Water Purified Machine 20tons Per Hour Reverse Osmosis Treatment System

Customer Visit
Water Purified Machine 20tons Per Hour Reverse Osmosis Treatment System

Packing and Service

Packing and Delivery
Water Purified Machine 20tons Per Hour Reverse Osmosis Treatment System
Quality Assurance
We guarantee the goods offered are brand-new, not used, with latest design and suitable material made, and we guarantee the specification of the equipment is consonance with the contract.
We guarantee the line achieve product technical performance indicators within 5 days after feeding operation through the correct guidance of the installation and commissioning.
We are responsible for the fault and damage of the production line caused by our design, technology, manufacture, installation, adjustment and material defect etc. that all belong to our responsibility.
The warranty period is 12 months after acceptance check of the production line. If there is any different between the furnished equipment in the customer's factory and the equipment concerned in the contract, the users have the right to pass the inspection book to the legal department to claim for compensation to our company within goods warranty period.


FAQ
Q1:Are you a trading company or a manufacturer?
A1:We are a manufacturer can give u professional service with best quality
Q2:What's your guarantee or the warranty of the quality if we buy your plants?
A2:We offer you high quality plants with 1 year guarantee . we will give u spare part free in 1 year.
Q3:When can I get my plant after I paid?
A3:We will deliver the plants on time as the date we agree both side.
Q4:How can I install my plant when it arrives?
A4:We will send our engineer to your side as soon as you get all your plants ready , for testing and teaching your technicians how to run the plants.
Q5:How about the spare parts?
A5:After we deal down all the things , we will offer you a spare parts list for your reference.


TURNKEY PROJECT

DROP US A LINE
Add
Shuangfeng road, zhaofeng town, zhangjiagang city, 
JiangSu province, China  
Tel/ Fax
+86-0512-58587888
Skype:
 jason18001565555
Mobile/WHATSAPP
 +86-18001565555 
2019  Zhangjiagang city Filltech Beverage Machinery Co.,LTD  All rights reserved.     Site Map