Service

+86 0512-58587888

Send us e-mail

WhatsApp/Call us now

Beverage Bottling丨Canning Machine

You are here: Home » Products » Auxiliary » Shrink Wrapping Machine » PLC Control Bottled Heat Shrink Wrapping Packing Machine

Mask Production Line

Share to:

PLC Control Bottled Heat Shrink Wrapping Packing Machine

The heat shrink film packing machine we designed is suitable for wrapping different kinds material of bottle beverage including PET bottle ,can bottle , glass bottle etc. And in our machine, the beverage packing can be with bottom-tray or without bottom-tray.

Quantity:
  • MB-150A
  • Filltech
  • 8422400000

Product Description

PLC Control  Bottled Heat Shrink Wrapping Packing Machine


The thermal film packing machine is suit for beverage, drinking water, beer, wine and infusion bottle ect, packaging, which can be packed without tray and with a firm and beautiful apperance.

package machine16

 

special features

Advantages of thermal film packing machine

1 Applying imported PLC which can control the machine automatically, with stable performance precise control

2 With the capacity of feeding and sorting bottles shrinking and cooling shaping automatically

3 Inductive switch control the feeding of film which can control the length of film and reduce the consumption

4 Imported tranducer control for the conveyor motor, which can realize stepless speed reguation

 

detail display

 

FT-150A is L type thermal film packing machine

package machine15

 

It is consist of bottle conveyor, cutting system, heat shrink package system

package machine3

 

package machine2

 

PLC+ Touch screen will make it easy for the workers who operate the machine

package machine17

 

technical parameter

FT-150A thermal film packing machine

The machine dimension  L5050*W3300*H2100mm
The weight  1200kg
Heat shrinkable furnace size  L3700*W920*H1750mm
The biggest package size  L420*W280*H350mm
Packing speed  8-12 package / minute
Conveyor belt height  920mm(adjustable 100mm)
The rated power  380v 50Hz
Work pressure  0.6-0.8Mpa
The engine power  20KW

 

Main componet detail list

NO Item name Specification Number Brand
1 Board production component

FILLTECH
2 Plant metal component

FILLTECH
3 Pneimatic component
1 Taiwan Airtec
4 Electric controlling component and accessory
5 Photoelectric switch
4 South Korea Autonics

Proximity switch
2 South Korea Autonics

PLC
1 Japan Panasonic

Touch screen
1 Taiwan Weinview

Frequency converter
3 Taiwan Teco

AC contactor
3 France Schneider

Mid-relay
8 OMRON Japan

 

packing and shippingshipping

 

Factory Price Two cavity automatic PET Bottle Manufacturing Machine for water line

Installation service

When you finish the preparation conditions, our fast and professional sale-after service engineer team will go to your factory to install the machine, give you the opearting manual, and train your employee until they could operate the machine well.

The sample service

The video of the running machine would be send to you.

You are welcome to visit our factory, and see the machine running.

We have rich experience in helping clients design the factory, bottle, label.

Customized service

Our machine would be desgined according to your requirements(material, power, filling method, bottle desgin, and so on). At the same time, we will give you our professional suggestion, we have been in this industry for many years.

After-sales service

1 We will delivery the machine and provide the bill of load on time to make sure you could get the machine quickly.

2 Two years warranty for main machine, one year warranty for electrical parts will be offered.

3 Well-trained and experienced staff will be ready to answer all your inquiries in English and Chinese.

4 Our busienss relationship will be confidential to any third party.

 

Factory Price Two cavity automatic PET Bottle Manufacturing Machine for water line

1 How about the spare parts?

We will send one year enough easy broken spare parts together with the machines, shipping together. During the warranty time, we will supply the spare parts with our cost including the delivery fees.

2 How long time for installation?

According to your machine order, we will send one or two engineers to your factory, it will take about 10 days to 25 days.

3 How to install my machines when it arrives? How much the cost?

We will send our engineers to your factory to install the machines and train your staff how to operate the machines. Customer pay air tickets go and back, accommodation and USD 100 / day / Person.

4 When can I get my machine after I paid?

Normally production time is about 30-60 days, the exactly depend on what kind of machine you order. The shipping time is based on your destination port.

5 Are you a trading company or a manufacturer?

We are professional manufacturer. Our factory has more than 19 years history. The factory price products with good quality will be supplied, welcome to visit.

 

Turnkey Project

Main product
★ 2,000~36,000BPH carbonated beverage bottling line;
★ 2,000~36,000BPH still purified water/ mineral water bottling line;
★ 2,000~36,000BPH tea/juice bottling line;
★ 2,000~36,000BPH milk/dairy bottling line;
★ 2,000~36,000BPH white/red alcohol drink bottling line;
★ 2,000~18,000cans/H cans beverage production line;
★ 100~2,000barrels/H, 3~5galon production line;
★ Blow moulding machine from 1000~24000BPH;
★ Water treatment system;
★ Beverage preparation system;
★ Turn key projects solutions.



Complete Automatic Groundwater Drink Water Purified Treatment Filter
Complete Automatic Groundwater Drink Water Purified Treatment Filter
Complete Automatic Groundwater Drink Water Purified Treatment Filter
Complete Automatic Groundwater Drink Water Purified Treatment Filter
Complete Automatic Groundwater Drink Water Purified Treatment Filter
Complete Automatic Groundwater Drink Water Purified Treatment Filter
Complete Automatic Groundwater Drink Water Purified Treatment Filter
Complete Automatic Groundwater Drink Water Purified Treatment Filter

Filltech Machine

1. Installation & adjustment
After the equipment are arrived at the customer's site, the customer is responsible for unpacking and arranging the equipment according to the placement
drawing; and does under our install-adjust technicians' guidance. Costs of the staff are decided at last.

2. Training
We are responsible for offering the technical training to user. The training content includes the structure and maintenance of the equipment, control and
operation of the equipment. Through training, users' technical staff can grasp and the skill of operation and maintenance proficiently, and deal with the general
troubles in time. We will appoint qualified technical staff for the guidance.
The buyer can send staff to our company for learning.

3. Quality assurance
We guarantee the goods offered are brand-new, not used, with latest design and suitable material made, and we guarantee the specification of the equipment is consonance with the contract.
We guarantee the line achieve product technical performance indicators within 5 days after feeding operation through the correct guidance of the installation and commissioning.
We are responsible for the fault and damage of the production line caused by our design, technology, manufacture, installation, adjustment and material defect etc. that all belong to our responsibility.
The warranty period is 12 months after acceptance check of the production line. If there is any different between the furnished equipment in the customer's factory and the equipment concerned in the contract, the users have the right to pass the inspection book to the legal department to claim for compensation to our company within goods warranty period.


CE Certification

CE Certification
1). Company has passed ISO9000: 2000 version quality system certification and all manufacture processes are conducted by the standard strictly.
2). All products adopt all-around computer aided design (CAD).
3). From processing to each process of assembly, all spare parts equip with special turn-over box to ensure not falling onto the ground during turning over.
4). Filling valves, capping heads and other main parts are process by digital lathe and processing center. And then they are assembled in special assembly room in order to keep their accuracy and cleanness.
5). All auxiliary parts adopt international and domestic famous brand products.
6). Before delivery time, all complete sets will test run for 3 days continuously. After quality inspection, they can be transferred to the customers.

Water Purified Machine 20tons Per Hour Reverse Osmosis Treatment System

Company Visit

Exhibition Show
Water Purified Machine 20tons Per Hour Reverse Osmosis Treatment System

Customer Visit
Water Purified Machine 20tons Per Hour Reverse Osmosis Treatment System

Packing and Service

Packing and Delivery
Water Purified Machine 20tons Per Hour Reverse Osmosis Treatment System
Quality Assurance
We guarantee the goods offered are brand-new, not used, with latest design and suitable material made, and we guarantee the specification of the equipment is consonance with the contract.
We guarantee the line achieve product technical performance indicators within 5 days after feeding operation through the correct guidance of the installation and commissioning.
We are responsible for the fault and damage of the production line caused by our design, technology, manufacture, installation, adjustment and material defect etc. that all belong to our responsibility.
The warranty period is 12 months after acceptance check of the production line. If there is any different between the furnished equipment in the customer's factory and the equipment concerned in the contract, the users have the right to pass the inspection book to the legal department to claim for compensation to our company within goods warranty period.


FAQ
Q1:Are you a trading company or a manufacturer?
A1:We are a manufacturer can give u professional service with best quality
Q2:What's your guarantee or the warranty of the quality if we buy your plants?
A2:We offer you high quality plants with 1 year guarantee . we will give u spare part free in 1 year.
Q3:When can I get my plant after I paid?
A3:We will deliver the plants on time as the date we agree both side.
Q4:How can I install my plant when it arrives?
A4:We will send our engineer to your side as soon as you get all your plants ready , for testing and teaching your technicians how to run the plants.
Q5:How about the spare parts?
A5:After we deal down all the things , we will offer you a spare parts list for your reference.


TURNKEY PROJECT

DROP US A LINE
Add
Shuangfeng road, zhaofeng town, zhangjiagang city, 
JiangSu province, China  
Tel/ Fax
+86-0512-58587888
Skype:
 jason18001565555
Mobile/WHATSAPP
 +86-18001565555 
2019  Zhangjiagang city Filltech Beverage Machinery Co.,LTD  All rights reserved.     Site Map